May 14, 2011

7 of 7 (Watch) Clean A Reverse Osmosis (RO) & Ice Line That Is Connected




This seventh part of the seven part series begins to fill the storage tank with water. It will take about 2 hours for the storage tank to fill. 

Now is the time to very thoroughly check every connection for leaks.  A small leak over a few months can cause thousands of dollars of damage to walls, cabinets and floors.  All connections should be checked a few hours after the initial leak inspection and then checked again the following day.

After the initial leak inspection place RO filter system in the cabinet under the sink.  Insure that no tubes are kinked.

The RO filter system and ice line sanitation routine and RO membrane and filter change is now complete.

     RO filter disinfection instructions:
  1. Turn off the RO faucet.
  2. Check for leaks.
  3. Replace RO filters and storage tank back under the sink.
Visit WaterProBill's Store.  
Visit us at Water Pro for more information.

    No comments:

    Post a Comment